In Avoyelles Parish, the parish Permitting Department issues development and electrical permits parish-wide and handles floodplain management for the unincorporated areas. If the lot is inside Marksville or another town, check with that town hall as well. Here is what the official sources say.
Get a free metal building quote
About 30 seconds: ZIP, job type, name and phone. One independent local contractor follows up. Free, no obligation.
The parish permitting office
The Avoyelles Parish Police Jury's Permitting Department says it enforces the building codes adopted by the Police Jury, issues development and electrical permits parish-wide, and provides floodplain management for the unincorporated areas of the parish. The office is on the first floor of the courthouse at 312 North Main Street in Marksville, LA 71351. It lists office hours as Monday through Friday, 7:30 a.m. to 4:00 p.m., phone (318) 253-7291, fax (318) 253-9218, and email permits@avoypj.org.
What the parish says needs a permit
The parish permits page says permits are required for residential, commercial, recreational and farm work, storage buildings, swimming pools, signs, solar panels, generators, rental, water wells, camps, additions, major renovations with or without utilities, purchasing an existing structure, electrical inspections and new mobile homes. A metal shop, garage, barn, carport or storage building usually falls under one of those categories, so plan on asking the permitting office which application fits your project before you order a building or pour a slab.
The parish publishes separate forms for a development permit, a new farm structure and new commercial use, along with other applications (including a RAPC trade form). Ask which form they want for a steel building on your lot. The page also notes that state and federal codes may require inspections by the parish's official building inspector or inspectors.
Starting work before the permit
The parish says penalty fees will be added to permit fees if structures are placed and/or new construction has begun. Do not set a delivered building or start slab or erection work until you know which permit you need.
Flood zones
The parish provides floodplain management for the unincorporated areas. Check your lot on the FEMA Flood Map Service Center before you settle on a slab height, and ask the permitting office what elevation or flood paperwork your address needs. See our flood zone guide for how to read a flood map.
Inside Marksville city limits
Marksville City Hall is at 427 N. Washington Street, Marksville, LA 71351, (318) 253-9500, Monday through Friday 7:30 a.m. to 4:00 p.m. If the lot is inside the city, call City Hall and ask who issues the building permit there and whether you also need a parish development or electrical permit.
Marksville also has a Historic Preservation District. The city's Historic District Commission page says the commission works through the building permit process, issues guidelines for exterior construction inside the district, and reviews petitions for alteration, repair, relocation, demolition or new construction of structures and for ground-disturbing work in the district. It meets on the first Thursday of every month at 6 p.m. The city publishes a Certificate of Appropriateness form and points to the official district map on the Avoyelles Parish Assessor's site. If your lot is downtown or you are unsure, ask City Hall whether it is in the historic district before you apply.
Other towns in the parish
If the lot is inside Bunkie, Cottonport, Simmesport, Mansura or another town or village, call that town hall first and ask who issues permits and inspects there, rather than assuming only the parish process applies.
What to settle with your contractor
- Is the lot inside Marksville, inside another town, or in the unincorporated parish? That decides who you call first.
- Which parish form applies: a development permit, a new farm structure, a commercial application, or something else?
- What wind speed is the building designed for? See our wind load guide and check your address on the ASCE Hazard Tool.
- Is the lot in a flood zone, and how high must the slab sit?
- If the lot is in Marksville's historic district, does the project need a Certificate of Appropriateness?
- Does the contractor need a Louisiana license for the job size? See our license guide.
- Will slab or post work need a Louisiana 811 locate first? See our 811 guide.
Building farther north, around Alexandria? See our Alexandria and Rapides Parish guide. Closer to Lafayette, around Opelousas? See our St. Landry Parish guide.
This guide is general information from the official sources listed below, not legal or engineering advice. Rules and fees change, so confirm with the permit office for your address.
General information only, not legal or engineering advice. Rules change, so confirm with the agency linked below or a licensed professional before you start work.
Sources
- Avoyelles Parish Police Jury: Permits
- Avoyelles Parish Police Jury: Development Permit form (PDF)
- Avoyelles Parish Police Jury: New Farm Structure form (PDF)
- Avoyelles Parish Police Jury: New Commercial use Requirements (PDF)
- City of Marksville
- City of Marksville: Forms / Minutes / Historic District Commission
- Louisiana State Licensing Board for Contractors: Types of Licenses
- FEMA Flood Map Service Center
- ASCE Hazard Tool (design wind speed lookup by address)
Last reviewed: October 2026.
Related: Metal shops & garages · Barns & ag buildings · Carports & RV covers · All guides