Metal building and carport permits in Vermilion Parish, LA

If your lot is in unincorporated Vermilion Parish, around Abbeville, Kaplan, Erath or Gueydan but outside a city or town limit, the Vermilion Parish Police Jury (VPPJ) permit office issues the permit. Here is what its own accessory building checklist (revised August 2023) asks for. If your lot is inside a city or town limit, ask the permit office which office covers your address.

Get a free metal building quote

About 30 seconds: ZIP, job type, name and phone. One independent local contractor follows up. Free, no obligation.

Free, no obligation. We never sell your details to multiple companies.

Where is the Vermilion Parish permit office?

The Vermilion Parish Police Jury Permit Department handles permits for unincorporated Vermilion Parish. The Police Jury lists its address as 100 North State Street, Abbeville, LA 70510, phone 337-898-4300, email permits@vppj.org, and the permit office hours as Monday to Friday, 7:00 AM to 4:00 PM. The parish says you need an address from its 911 Business Office before you can get a permit, and you can now apply and pay for permits online through its Civic Access portal. Septic questions go to Sanitation at 337-893-1438.

Planning a metal building, shop or carport in Vermilion Parish? Request a free quote and one independent local contractor will follow up; they can also tell you whether they handle the permit.

Why the parish reviews plans

The VPPJ checklist says that since January 1, 2023, when the Louisiana State Uniform Construction Code Council adopted the 2021 International Building Code and International Residential Code, plans for accessory buildings are reviewed before a permit is issued, to check the wind load and flood provisions. It says the review can take up to one week, and plans are emailed to the permit office.

Metal buildings need stamped drawings

The checklist states that metal building drawings must be stamped by a licensed architect or engineer. Ask the seller or contractor whether stamped drawings for your address are included.

400 square feet or less

Over 400 square feet

Plan review and inspections are required. The plans must include:

Paperwork for every permit

After the permit

If you add electricity or plumbing, the checklist says to take the permit, deed and site plan to the parish Sanitation office, or the release of electricity can be delayed. Owners or contractors schedule the inspections with the parish's inspection firm. The parish issues a certificate of occupancy once the inspections and any final elevation certificate are approved. The checklist notes that VPPJ accepts only checks or money orders.

What to settle with your contractor

General information only, not legal or engineering advice. Rules change, so confirm with the agency linked below or a licensed professional before you start work.