Lafayette Metal BuildingsGet a Quote

Metal building and carport permits in Scott, LA

Scott, just west of Lafayette along I-10, runs its own permit office at City Hall for property inside the city limits. If your lot is outside the city limits in unincorporated Lafayette Parish, Lafayette Consolidated Government handles the permit instead; see our Lafayette permit guide. Here is what the City of Scott's own permit packet, business guide and zoning ordinance say.

Get a free metal building quote

About 30 seconds: ZIP, job type, name and phone. One independent local contractor follows up. Free, no obligation.

Free, no obligation. We never sell your details to multiple companies.

Where to apply

Scott City Hall is at 125 Lions Club Road. The city's residential permit application says to deliver the application, a site plan and a full set of plans to City Hall, or to email the application and site plan as PDFs to the permit office. The city says you'll be notified once it is approved. Commercial projects have their own commercial permit package on the city's Forms page.

Accessory buildings need a map compliance verification

Scott's zoning ordinance requires a map compliance verification before you place an accessory structure for residential use, and for new construction and additions. It says no building, including an accessory structure, may be moved, built or altered (other than ordinary maintenance) until that verification is issued, and it has to be done before or together with the building permit application. A detached shop, garage or carport on a home lot falls under this, so ask City Hall about it when you apply.

What the residential packet asks for

The packet lists plan review, building, mechanical, electrical and plumbing permits, with fees that vary. The city's business guide says plan review takes about 3 to 5 business days and costs $70 for residential and $100 for commercial, paid up front. Fees can change, so confirm the current amounts with City Hall.

Setbacks

The setback ordinance printed in Scott's packet requires a front setback of at least 20 feet from the road right-of-way, and side and rear setbacks of at least 5 feet from the property line where the lot doesn't border a street (10 feet from the right-of-way where it does). Zoning and subdivision restrictions can add to this, and the application has you confirm you've checked servitudes, easements and deed restrictions, so check before you pick the spot for a shop or carport.

Freeboard and flood rules

Scott's packet says the city has a 1-foot freeboard ordinance. In a flood zone you need an elevation certificate from a registered engineer, architect or land surveyor. In an X zone, the floor has to be 1 foot above the center of the roadway or 1 foot above the nearest base flood elevation, recorded on a Freeboard Elevation Form. If any part of the property is in the special flood hazard area, the packet says zero net fill is required. Check your lot on the FEMA Flood Map Service Center and see our flood zone guide.

Inspections

A pre-slab certificate verifying setbacks and flood elevation must be turned in before the slab inspection. Before the final inspection, a final certificate with photos goes to the City Hall permit department. The packet says all inspections need 24 to 48 hours' notice to the city's inspection contractor. If you are pouring a slab for a shop, ask your contractor who hires the surveyor for the pre-slab and final certificates.

What to settle with your contractor

Want a local company to quote a shop, garage or carport in Scott? Request a free quote.

General information only, not legal or engineering advice. Rules change, so confirm with the agency linked below or a licensed professional before you start work.

Sources

Last reviewed: October 2026.

Related: Metal shops & garages · Carports & RV covers · Carencro · All guides

Request a free building quote